Post

Building Bike Trails in Beitostølen 2021

Building mountain bike trails in Beitostølen: access roads, swamp crossings, and a great view from the office.

Building Bike Trails in Beitostølen 2021

Introduction

This was our second summer season in Beitostølen building trails. We were given the task of building a set of bike trails, each with a defined start and end point and a designated difficulty level, but otherwise given freedom to choose where they went.

Wide view from the ridge


The Process

The first step was building the access road in. This meant carefully peeling back the torv (the top layer of peat and vegetation) so it could be folded back down on the way out. This required a careful touch with the machine: cutting it cleanly and flipping it up without tearing it.

Base layer shaped with local material

Once the torv was flipped up to the sides, we would shape the local material into a rough road. Then we laid down a layer of geotextile fiber followed by 0–32 crushed stone. This gave the access road a solid, smooth surface for the dumpers, allowing for much quicker material transport and significantly better operator comfort over long days.

Fiber being laid Geotextile fiber

0–32 added 0–32 stone on top of the fiber

Mid process

Loading brush

Loading brush 2

Timelapse


The Swamp Crossing

Crossing the swamp

The bog was very deep. We considered a few alternatives to get across, including driving piles and building a wooden walkway/bridge. If we went that route, we would have had to build a bridge that was strong enough not just for bikes and people, but for our equipment as well. In the end, the most practical solution was to dump large rocks to establish a solid base. This also meant we could use up rocks that could not fit into the base of the trail. To avoid disrupting the natural water flow through the bog, we installed a large pipe underneath. I’ve checked on the myr a few times with satelite imagery and it seems the crossing has not had an impact on the surrounding area.

Swamp pipe

We relocated torv from other areas to finish the edges cleanly and blend the crossing back into the landscape.


A New Machine

Part of this season involved getting the delivery of a brand new machine with a set of new attachments, including the Engcon EC-Oil system. EC-Oil works really well, so long as you keep it clean, like any other hydraulic coupling.

New machine


Testing the Trail

Test riding the trail


Closing Thoughts

There is something special about building something that will be there for decades. I did not expect to get as much joy as I did from watching others enjoy a trail I had helped make.

Trail building ran from late June until late August 2021. Many trips from Hareid to Beitostølen, with long days for long stretches at a time. It was a fun time building these trails in Beitostølen. Biking to and from work was a great perk.

Nice sunset

Equipment leaving Equipment heading to the next project

This post is licensed under CC BY-NC-ND 4.0 by the author.